[Uml-devel] [Bug 57672] New: Activity diagram fork/join lines--can't change length
Stevan White
stevan_white at hotmail.com
Thu Apr 24 19:22:04 UTC 2003
------- You are receiving this mail because: -------
You are the assignee for the bug, or are watching the assignee.
http://bugs.kde.org/show_bug.cgi?id=57672
Summary: Activity diagram fork/join lines--can't change length
Product: umbrello
Version: 1.1.1
Platform: Mandrake RPMs
OS/Version: Linux
Status: UNCONFIRMED
Severity: normal
Priority: NOR
Component: general
AssignedTo: umbrello-devel at kde.org
ReportedBy: stevan_white at hotmail.com
Version: 1.1.1 (using KDE KDE 3.1)
Installed from: Mandrake RPMs
OS: Linux
I have been unable to change the length of fork/join lines in activity diagrams. I can't do it by dragging the end points; putting multiple flows between fork/join lines doesn't change their length automatically. I can just lay one fork/join line next to the other, but this seems really clumsy.
More information about the umbrello-devel
mailing list