[Korganizer-devel] [Bug 286984] New: event not shown in month view when it spans over several sheets
Martin Stolpe
martinstolpe at gmail.com
Sat Nov 19 11:41:27 UTC 2011
https://bugs.kde.org/show_bug.cgi?id=286984
Summary: event not shown in month view when it spans over
several sheets
Product: kontact
Version: 0.7.3
Platform: Archlinux Packages
OS/Version: Linux
Status: UNCONFIRMED
Severity: normal
Priority: NOR
Component: calendar
AssignedTo: korganizer-devel at kde.org
ReportedBy: martinstolpe at gmail.com
Version: 0.7.3 (using KDE 4.7.3)
OS: Linux
When I select month view and choose january 2012 the view ranges from
2011.12.26 to 2012.02.05.When I add an event which is in this range (eg
2011.12.26 - 2012.01.06) it is shown in the calender.
If I change the range to a date which is before the first shown date (eg
2011.12.25 - 2012.01.06) the event is not shown on the calender.
The event is also shown when the date is after the last date shown on the
calender (eg 2012.02.03 - 2012.02.08).
Reproducible: Always
Steps to Reproduce:
Open calendar in contact
Change view to "Month View"
View january 2012 in "Month View"
Add an event ranging from 2011.12.22 - 2012.01.06
Actual Results:
Event is not shown in calendar
Expected Results:
Event should shown up in calendar
--
Configure bugmail: https://bugs.kde.org/userprefs.cgi?tab=email
------- You are receiving this mail because: -------
You are the assignee for the bug.
More information about the Korganizer-devel
mailing list