D21073: Impact of scheduler settings on total imaging time corrected
Wolfgang Reissenberger
noreply at phabricator.kde.org
Tue May 7 18:50:54 BST 2019
wreissenberger created this revision.
wreissenberger added reviewers: mutlaqja, TallFurryMan.
Herald added a project: KDE Edu.
Herald added a subscriber: kde-edu.
wreissenberger requested review of this revision.
REVISION SUMMARY
Scheduler settings like tracking, focusing, aligning and guiding are calculated only once per schedule and not multiplied by the number of open iterations, which led to exaggerated estimations.
TEST PLAN
- Activate the scheduler setting "Remember job progress.
- Create a schedule with completion condition "Repeat for x runs".
- Do not activate the steps for tracking, focussing etc.
- Modify the schedule and check, that the estimated duration varies by 1-2 min, whenever you activate or deactivate one of the steps.
REPOSITORY
R321 KStars
BRANCH
bug_estimated_job_time
REVISION DETAIL
https://phabricator.kde.org/D21073
AFFECTED FILES
kstars/ekos/scheduler/scheduler.cpp
To: wreissenberger, mutlaqja, TallFurryMan
Cc: kde-edu, narvaez, apol
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mail.kde.org/pipermail/kde-edu/attachments/20190507/ddc607c2/attachment.html>
More information about the kde-edu
mailing list