<table><tr><td style="">wreissenberger created this revision.<br />wreissenberger added reviewers: mutlaqja, TallFurryMan.<br />Herald added a project: KDE Edu.<br />Herald added a subscriber: kde-edu.<br />wreissenberger requested review of this revision.
</td><a style="text-decoration: none; padding: 4px 8px; margin: 0 8px 8px; float: right; color: #464C5C; font-weight: bold; border-radius: 3px; background-color: #F7F7F9; background-image: linear-gradient(to bottom,#fff,#f1f0f1); display: inline-block; border: 1px solid rgba(71,87,120,.2);" href="https://phabricator.kde.org/D21073">View Revision</a></tr></table><br /><div><strong>REVISION SUMMARY</strong><div><p>Scheduler settings like tracking, focusing, aligning and guiding are calculated only once per schedule and not multiplied by the number of open iterations, which led to exaggerated estimations.</p></div></div><br /><div><strong>TEST PLAN</strong><div><ul class="remarkup-list">
<li class="remarkup-list-item">Activate the scheduler setting "Remember job progress.</li>
<li class="remarkup-list-item">Create a schedule with completion condition "Repeat for x runs".</li>
<li class="remarkup-list-item">Do not activate the steps for tracking, focussing etc.</li>
<li class="remarkup-list-item">Modify the schedule and check, that the estimated duration varies by 1-2 min, whenever you activate or deactivate one of the steps.</li>
</ul></div></div><br /><div><strong>REPOSITORY</strong><div><div>R321 KStars</div></div></div><br /><div><strong>BRANCH</strong><div><div>bug_estimated_job_time</div></div></div><br /><div><strong>REVISION DETAIL</strong><div><a href="https://phabricator.kde.org/D21073">https://phabricator.kde.org/D21073</a></div></div><br /><div><strong>AFFECTED FILES</strong><div><div>kstars/ekos/scheduler/scheduler.cpp</div></div></div><br /><div><strong>To: </strong>wreissenberger, mutlaqja, TallFurryMan<br /><strong>Cc: </strong>kde-edu, narvaez, apol<br /></div>