D14684: Fixes for the Scheduler and Capture modules
Jasem Mutlaq
noreply at phabricator.kde.org
Sat Aug 11 14:40:03 BST 2018
mutlaqja added a comment.
Thanks for the updates. Just tested again now with complex_job.esl and I already captured before, it is is perfect opportunity to test. It evaluated those the 3 jobs:
1. LRGB 20/20 --> Correct, it's done already
2. LSOH 9/72 ---> Incorrect. It is 10/72. Since 6x L + 4x SII were captured for this job.
3. LRGB 20/20 --> Incorrect since the job didn't even begin
REPOSITORY
R321 KStars
REVISION DETAIL
https://phabricator.kde.org/D14684
To: TallFurryMan, mutlaqja, wreissenberger
Cc: kde-edu, narvaez, apol
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mail.kde.org/pipermail/kde-edu/attachments/20180811/0662a285/attachment.html>
More information about the kde-edu
mailing list