Merge window before the port starts
Inge Wallin
inge at lysator.liu.se
Sun Jan 25 10:59:39 GMT 2015
Hi,
As you have probably seen I have two patches that I deem mature on the review
board right now. These are branches that have been Ok'ed and are ready to
merge. And I know that there are others with similar branches laying around.
It would be a pity to let them bitrot more than necessary.
I talked with Cyrille on IRC and he suggested that we open a merge window just
before the port starts. The merge window should be very short (1-2 days only)
and only for patches and branches that are:
- Well tested and reviewed
- Finished in some sense - no work in progress
He asked me to propose this on the ML, which I hereby do, and to forward his
support for the idea.
I, myself, see no reason why we cannot open master for patches of this type
already now, but I will let you decide whether opening master now or wait for
a merge window is the best way forward.
More information about the calligra-devel
mailing list