Lessons for PA3
Stefan Werden
stefan.werden at open-slx.de
Fri Dec 16 13:32:35 UTC 2011
Very good suggestions.
If we like to have download-images at the release it would be nice to
have 1-2 to do the system integration (5 would be better, but probably
not realistic)
The rest
+++1
On Fri, 16 Dec 2011 11:57:05 +0100, Sebastian Kügler wrote:
> Hey all,
>
> So now PA2 is out the door -- congratulations on this to everyone!
>
> As our experiences are fresh, our thoughts unstructured and our
> emotions laden
> with release-adrenaline, let's talk about what we want to do
> differently in
> our next cycle.
>
> * Longer cycle
>
> The past cycle, having been extremely short, we didn't have the time
> to
> introduce some bigger changes, that we thought were almost ready.
> This
> includes the window strip, startactive (in the Balsam case),
> pre-configured
> homedirs and a few more items. I think we really got in what we
> could, but a
> longer cycle would have been better.
>
> * Longer freeze
>
> The time between "code ready" and release was too short. It didn't
> leave
> enough time to package, test and build images, so at release, not
> everything
> was ready. It should really be at least one week after we're done
> with the
> code (I mean, really done :-))
>
> * Clearer "what do we ship"
>
> There has been quite a bit of patch juggling in the last days before
> the
> release, and to me it was hard to find out what exactly to ship. We
> need to
> get this more clearly defined, and have some time between code-freeze
> and
> release to make sure everything works.
>
> I'm sure there are other things we want to improve, but these are the
> most
> important ones that spring to my mind. If we keep these in mind, I'm
> sure our
> shared stress levels can be kept at a lower rate for future releases.
>
> Cheers,