[Uml-devel] [Bug 129914] New: Cannot insert transition/association TO fork/join node in activity diagram
Daniel Bausch
BarnieMan at gmx.net
Tue Jun 27 15:15:47 UTC 2006
------- You are receiving this mail because: -------
You are the assignee for the bug, or are watching the assignee.
http://bugs.kde.org/show_bug.cgi?id=129914
Summary: Cannot insert transition/association TO fork/join node
in activity diagram
Product: umbrello
Version: 1.5.2
Platform: Gentoo Packages
OS/Version: Linux
Status: UNCONFIRMED
Severity: normal
Priority: NOR
Component: general
AssignedTo: umbrello-devel.kde.org
ReportedBy: BarnieMan gmx net
Version: 1.5.2 (using KDE KDE 3.5.2)
Installed from: Gentoo Packages
Compiler: GCC 3.4.6
OS: Linux
Steps to reproduce:
1. Create a new activity diagram.
2. Place a starting node
3. Place a fork/join node
4. Try to draw an arrow from the starting node to the fork/join node
=> An error message pops up, saying this were an invalid association.
(An arrow from the fork to another node, in contrast, is possible.)
In earlier versions (KDE 3.4) this was possible.
PS: This arrow should be called a "transition". (I've got the german translation.)
More information about the umbrello-devel
mailing list