Moving Spectacle to the Plasma release schedule
Luigi Toscano
luigi.toscano at tiscali.it
Thu Dec 12 18:48:20 GMT 2024
Noah Davis ha scritto:
> Thinking about it again, I don't think it would actually be necessary
> to make 24.12 a short release. I could easily handle 24.12.1-24.12.3
> and 6.2.90-6.3.3 simultaneously. It's not like any big changes will
> make it into 24.12 at this point. Spectacle 6.3 will probably get more
> love than 24.12 though, mostly because it can actually synchronize
> with KWin and KPipeWire.
We are not able to handle two stable translations branches for KF6.
Unless you want to track the spectacle/plasma translations from trunk_kf6 and
the spectacle/gear translations from stable_kf6. But I would advise against
that, unless it's really, really needed.
--
Luigi
More information about the Plasma-devel
mailing list