[Bug 259839] New: subtasks aren't displayed in the tasklist under their parent task
Ludwig Reiter
ludwig.reiter at intevation.de
Tue Dec 14 13:02:53 GMT 2010
https://bugs.kde.org/show_bug.cgi?id=259839
Summary: subtasks aren't displayed in the tasklist under their
parent task
Product: KOrganizer Mobile
Version: unspecified
Platform: Windows CE
OS/Version: Windows CE
Status: NEW
Severity: normal
Priority: NOR
Component: tasks
AssignedTo: kdepim-bugs at kde.org
ReportedBy: ludwig.reiter at intevation.de
Version: unspecified (using Devel)
OS: Windows CE
version: 2010-12-13 svn-1206065
Reproducible: Always
Steps to Reproduce:
1. Clean up task list.
2. Create three test tasks (e.g.s1-3)
3. Select the first task in the list.
4. Create Subtask (e.g. sub)
5. Look at the task list
Actual Results:
The subtask is displayed below the last task.
Expected Results:
The subtask should be displayed under the parent task.
--
Configure bugmail: https://bugs.kde.org/userprefs.cgi?tab=email
------- You are receiving this mail because: -------
You are the assignee for the bug.
More information about the Kdepim-bugs
mailing list