[Bug 182796] New: wish: multiweek view in calendar
doc.evans at gmail.com
doc.evans at gmail.com
Sun Feb 1 21:42:00 GMT 2009
http://bugs.kde.org/show_bug.cgi?id=182796
Summary: wish: multiweek view in calendar
Product: kontact
Version: unspecified
Platform: Ubuntu Packages
OS/Version: Linux
Status: UNCONFIRMED
Severity: wishlist
Priority: NOR
Component: general
AssignedTo: kdepim-bugs at kde.org
ReportedBy: doc.evans at gmail.com
Version: (using KDE 4.1.4)
OS: Linux
Installed from: Ubuntu Packages
The month view is rather restrictive. It would be much more useful to have the
ability to view multiple weeks, configurable so that one could say something
like "start this view such that last week is the first week displayed". This
would allow one easily to view a week or two into the past and also several
weeks into the future (on displays that can show many weeks).
Having a display that shows six weeks, it's very frustrating that today (for
example) the "month" display comes up showing zero days in the past, since the
1st is the first day to be displayed. One could configure preferences for a
multiweek view to show one or two weeks in the past, which would be much more
useful.
I'm not suggesting that the month view be configurable in this way (although
that would be a possibility too, but I think it would be confusing). A separate
"multiweek" view would be a better solution to the need to view events in the
recent past, I think.
--
Configure bugmail: http://bugs.kde.org/userprefs.cgi?tab=email
------- You are receiving this mail because: -------
You are the assignee for the bug.
More information about the Kdepim-bugs
mailing list