[k3b] [Bug 384750] Progress bars don't work when I save a project to an ISO file
Leslie Zhai
bugzilla_noreply at kde.org
Mon Sep 25 03:06:38 UTC 2017
https://bugs.kde.org/show_bug.cgi?id=384750
--- Comment #5 from Leslie Zhai <lesliezhai at llvm.org.cn> ---
but it updates the percentage for me:
K3b::IsoImager
-----------------------
mkisofs print size result: 194070 (397455360 bytes)
System
-----------------------
K3b Version: 17.11.70
KDE Version: 5.36.0
Qt Version: 5.7.1
Kernel: 4.12.11-200.fc25.x86_64
Used versions
-----------------------
mkisofs: 1.1.11
mkisofs
-----------------------
194070
I: -input-charset not specified, using utf-8 (detected in locale settings)
Using CMAKEDETERMINECOMPILERAB000.BIN;1 for
AMDAPPSDK-3.0/samples/opencl/cl/1.x/HelloWorld/build/CMakeFiles/3.9.0/CMakeDetermineCompilerABI_CXX.bin
(CMakeDetermineCompilerABI_C.bin)
0.52% done, estimate finish Mon Sep 25 11:04:34 2017
0.77% done, estimate finish Mon Sep 25 11:04:34 2017
1.04% done, estimate finish Mon Sep 25 11:04:34 2017
1.29% done, estimate finish Mon Sep 25 11:04:34 2017
1.55% done, estimate finish Mon Sep 25 11:04:34 2017
1.81% done, estimate finish Mon Sep 25 11:04:34 2017
2.07% done, estimate finish Mon Sep 25 11:04:34 2017
2.32% done, estimate finish Mon Sep 25 11:04:34 2017
2.58% done, estimate finish Mon Sep 25 11:04:34 2017
2.83% done, estimate finish Mon Sep 25 11:04:34 2017
3.10% done, estimate finish Mon Sep 25 11:04:34 2017
3.35% done, estimate finish Mon Sep 25 11:04:34 2017
3.61% done, estimate finish Mon Sep 25 11:04:34 2017
3.87% done, estimate finish Mon Sep 25 11:04:34 2017
4.13% done, estimate finish Mon Sep 25 11:04:34 2017
4.38% done, estimate finish Mon Sep 25 11:04:34 2017
4.64% done, estimate finish Mon Sep 25 11:04:34 2017
4.90% done, estimate finish Mon Sep 25 11:04:34 2017
5.16% done, estimate finish Mon Sep 25 11:04:34 2017
5.42% done, estimate finish Mon Sep 25 11:04:34 2017
5.67% done, estimate finish Mon Sep 25 11:04:34 2017
5.93% done, estimate finish Mon Sep 25 11:04:34 2017
6.19% done, estimate finish Mon Sep 25 11:04:34 2017
6.45% done, estimate finish Mon Sep 25 11:04:34 2017
6.70% done, estimate finish Mon Sep 25 11:04:34 2017
6.96% done, estimate finish Mon Sep 25 11:04:34 2017
7.22% done, estimate finish Mon Sep 25 11:04:34 2017
7.48% done, estimate finish Mon Sep 25 11:04:34 2017
7.73% done, estimate finish Mon Sep 25 11:04:34 2017
7.99% done, estimate finish Mon Sep 25 11:04:34 2017
8.25% done, estimate finish Mon Sep 25 11:04:34 2017
8.51% done, estimate finish Mon Sep 25 11:04:34 2017
8.76% done, estimate finish Mon Sep 25 11:04:34 2017
9.02% done, estimate finish Mon Sep 25 11:04:34 2017
9.28% done, estimate finish Mon Sep 25 11:04:34 2017
9.54% done, estimate finish Mon Sep 25 11:04:34 2017
9.79% done, estimate finish Mon Sep 25 11:04:34 2017
10.05% done, estimate finish Mon Sep 25 11:04:34 2017
10.31% done, estimate finish Mon Sep 25 11:04:34 2017
10.57% done, estimate finish Mon Sep 25 11:04:34 2017
10.82% done, estimate finish Mon Sep 25 11:04:34 2017
11.08% done, estimate finish Mon Sep 25 11:04:34 2017
11.34% done, estimate finish Mon Sep 25 11:04:34 2017
11.60% done, estimate finish Mon Sep 25 11:04:34 2017
11.86% done, estimate finish Mon Sep 25 11:04:34 2017
12.11% done, estimate finish Mon Sep 25 11:04:34 2017
12.37% done, estimate finish Mon Sep 25 11:04:34 2017
12.63% done, estimate finish Mon Sep 25 11:04:34 2017
12.89% done, estimate finish Mon Sep 25 11:04:34 2017
13.14% done, estimate finish Mon Sep 25 11:04:34 2017
13.40% done, estimate finish Mon Sep 25 11:04:34 2017
13.66% done, estimate finish Mon Sep 25 11:04:34 2017
13.92% done, estimate finish Mon Sep 25 11:04:34 2017
14.17% done, estimate finish Mon Sep 25 11:04:34 2017
14.44% done, estimate finish Mon Sep 25 11:04:34 2017
14.69% done, estimate finish Mon Sep 25 11:04:34 2017
14.95% done, estimate finish Mon Sep 25 11:04:34 2017
15.20% done, estimate finish Mon Sep 25 11:04:34 2017
15.47% done, estimate finish Mon Sep 25 11:04:34 2017
15.72% done, estimate finish Mon Sep 25 11:04:34 2017
15.98% done, estimate finish Mon Sep 25 11:04:34 2017
16.23% done, estimate finish Mon Sep 25 11:04:34 2017
16.50% done, estimate finish Mon Sep 25 11:04:34 2017
16.75% done, estimate finish Mon Sep 25 11:04:34 2017
17.01% done, estimate finish Mon Sep 25 11:04:34 2017
17.26% done, estimate finish Mon Sep 25 11:04:34 2017
17.53% done, estimate finish Mon Sep 25 11:04:34 2017
17.78% done, estimate finish Mon Sep 25 11:04:34 2017
18.04% done, estimate finish Mon Sep 25 11:04:34 2017
18.29% done, estimate finish Mon Sep 25 11:04:34 2017
18.56% done, estimate finish Mon Sep 25 11:04:34 2017
18.81% done, estimate finish Mon Sep 25 11:04:34 2017
19.07% done, estimate finish Mon Sep 25 11:04:34 2017
19.32% done, estimate finish Mon Sep 25 11:04:34 2017
19.59% done, estimate finish Mon Sep 25 11:04:34 2017
19.84% done, estimate finish Mon Sep 25 11:04:34 2017
20.10% done, estimate finish Mon Sep 25 11:04:34 2017
20.36% done, estimate finish Mon Sep 25 11:04:34 2017
20.62% done, estimate finish Mon Sep 25 11:04:34 2017
20.87% done, estimate finish Mon Sep 25 11:04:34 2017
21.13% done, estimate finish Mon Sep 25 11:04:34 2017
21.39% done, estimate finish Mon Sep 25 11:04:34 2017
21.65% done, estimate finish Mon Sep 25 11:04:34 2017
21.90% done, estimate finish Mon Sep 25 11:04:34 2017
22.16% done, estimate finish Mon Sep 25 11:04:34 2017
22.42% done, estimate finish Mon Sep 25 11:04:34 2017
22.68% done, estimate finish Mon Sep 25 11:04:34 2017
22.94% done, estimate finish Mon Sep 25 11:04:34 2017
23.19% done, estimate finish Mon Sep 25 11:04:34 2017
23.45% done, estimate finish Mon Sep 25 11:04:34 2017
23.71% done, estimate finish Mon Sep 25 11:04:34 2017
23.97% done, estimate finish Mon Sep 25 11:04:34 2017
24.22% done, estimate finish Mon Sep 25 11:04:34 2017
24.48% done, estimate finish Mon Sep 25 11:04:34 2017
24.74% done, estimate finish Mon Sep 25 11:04:34 2017
25.00% done, estimate finish Mon Sep 25 11:04:34 2017
25.25% done, estimate finish Mon Sep 25 11:04:34 2017
25.51% done, estimate finish Mon Sep 25 11:04:34 2017
25.77% done, estimate finish Mon Sep 25 11:04:34 2017
26.03% done, estimate finish Mon Sep 25 11:04:34 2017
26.28% done, estimate finish Mon Sep 25 11:04:34 2017
26.54% done, estimate finish Mon Sep 25 11:04:34 2017
26.80% done, estimate finish Mon Sep 25 11:04:34 2017
27.06% done, estimate finish Mon Sep 25 11:04:34 2017
27.32% done, estimate finish Mon Sep 25 11:04:34 2017
27.57% done, estimate finish Mon Sep 25 11:04:34 2017
27.83% done, estimate finish Mon Sep 25 11:04:34 2017
28.09% done, estimate finish Mon Sep 25 11:04:34 2017
28.34% done, estimate finish Mon Sep 25 11:04:34 2017
28.60% done, estimate finish Mon Sep 25 11:04:34 2017
28.86% done, estimate finish Mon Sep 25 11:04:34 2017
29.12% done, estimate finish Mon Sep 25 11:04:34 2017
29.37% done, estimate finish Mon Sep 25 11:04:34 2017
29.63% done, estimate finish Mon Sep 25 11:04:34 2017
29.89% done, estimate finish Mon Sep 25 11:04:34 2017
30.15% done, estimate finish Mon Sep 25 11:04:34 2017
30.41% done, estimate finish Mon Sep 25 11:04:34 2017
30.66% done, estimate finish Mon Sep 25 11:04:34 2017
30.92% done, estimate finish Mon Sep 25 11:04:34 2017
31.18% done, estimate finish Mon Sep 25 11:04:34 2017
31.44% done, estimate finish Mon Sep 25 11:04:34 2017
31.69% done, estimate finish Mon Sep 25 11:04:34 2017
31.95% done, estimate finish Mon Sep 25 11:04:34 2017
32.21% done, estimate finish Mon Sep 25 11:04:34 2017
32.47% done, estimate finish Mon Sep 25 11:04:34 2017
32.72% done, estimate finish Mon Sep 25 11:04:34 2017
32.98% done, estimate finish Mon Sep 25 11:04:34 2017
33.24% done, estimate finish Mon Sep 25 11:04:34 2017
33.50% done, estimate finish Mon Sep 25 11:04:34 2017
33.75% done, estimate finish Mon Sep 25 11:04:34 2017
34.01% done, estimate finish Mon Sep 25 11:04:34 2017
34.27% done, estimate finish Mon Sep 25 11:04:34 2017
34.53% done, estimate finish Mon Sep 25 11:04:34 2017
34.78% done, estimate finish Mon Sep 25 11:04:34 2017
35.04% done, estimate finish Mon Sep 25 11:04:34 2017
35.30% done, estimate finish Mon Sep 25 11:04:34 2017
35.56% done, estimate finish Mon Sep 25 11:04:34 2017
35.81% done, estimate finish Mon Sep 25 11:04:34 2017
36.07% done, estimate finish Mon Sep 25 11:04:34 2017
36.33% done, estimate finish Mon Sep 25 11:04:34 2017
36.59% done, estimate finish Mon Sep 25 11:04:34 2017
36.85% done, estimate finish Mon Sep 25 11:04:34 2017
37.10% done, estimate finish Mon Sep 25 11:04:34 2017
37.36% done, estimate finish Mon Sep 25 11:04:34 2017
37.62% done, estimate finish Mon Sep 25 11:04:34 2017
37.88% done, estimate finish Mon Sep 25 11:04:34 2017
38.13% done, estimate finish Mon Sep 25 11:04:34 2017
38.39% done, estimate finish Mon Sep 25 11:04:34 2017
38.65% done, estimate finish Mon Sep 25 11:04:34 2017
38.91% done, estimate finish Mon Sep 25 11:04:34 2017
39.16% done, estimate finish Mon Sep 25 11:04:34 2017
39.42% done, estimate finish Mon Sep 25 11:04:34 2017
39.68% done, estimate finish Mon Sep 25 11:04:34 2017
39.94% done, estimate finish Mon Sep 25 11:04:34 2017
40.19% done, estimate finish Mon Sep 25 11:04:34 2017
40.45% done, estimate finish Mon Sep 25 11:04:34 2017
40.71% done, estimate finish Mon Sep 25 11:04:34 2017
40.97% done, estimate finish Mon Sep 25 11:04:34 2017
41.22% done, estimate finish Mon Sep 25 11:04:34 2017
41.48% done, estimate finish Mon Sep 25 11:04:34 2017
41.74% done, estimate finish Mon Sep 25 11:04:34 2017
42.00% done, estimate finish Mon Sep 25 11:04:34 2017
42.26% done, estimate finish Mon Sep 25 11:04:34 2017
42.51% done, estimate finish Mon Sep 25 11:04:34 2017
42.77% done, estimate finish Mon Sep 25 11:04:34 2017
43.03% done, estimate finish Mon Sep 25 11:04:34 2017
43.29% done, estimate finish Mon Sep 25 11:04:34 2017
43.54% done, estimate finish Mon Sep 25 11:04:34 2017
43.81% done, estimate finish Mon Sep 25 11:04:34 2017
44.06% done, estimate finish Mon Sep 25 11:04:34 2017
44.32% done, estimate finish Mon Sep 25 11:04:34 2017
44.57% done, estimate finish Mon Sep 25 11:04:34 2017
44.84% done, estimate finish Mon Sep 25 11:04:34 2017
45.09% done, estimate finish Mon Sep 25 11:04:34 2017
45.35% done, estimate finish Mon Sep 25 11:04:34 2017
45.60% done, estimate finish Mon Sep 25 11:04:34 2017
45.87% done, estimate finish Mon Sep 25 11:04:34 2017
46.12% done, estimate finish Mon Sep 25 11:04:34 2017
46.38% done, estimate finish Mon Sep 25 11:04:34 2017
46.63% done, estimate finish Mon Sep 25 11:04:34 2017
46.90% done, estimate finish Mon Sep 25 11:04:34 2017
47.15% done, estimate finish Mon Sep 25 11:04:34 2017
47.41% done, estimate finish Mon Sep 25 11:04:34 2017
47.66% done, estimate finish Mon Sep 25 11:04:34 2017
47.93% done, estimate finish Mon Sep 25 11:04:34 2017
48.18% done, estimate finish Mon Sep 25 11:04:34 2017
48.44% done, estimate finish Mon Sep 25 11:04:34 2017
48.69% done, estimate finish Mon Sep 25 11:04:34 2017
48.96% done, estimate finish Mon Sep 25 11:04:34 2017
49.21% done, estimate finish Mon Sep 25 11:04:34 2017
49.47% done, estimate finish Mon Sep 25 11:04:34 2017
49.72% done, estimate finish Mon Sep 25 11:04:34 2017
49.99% done, estimate finish Mon Sep 25 11:04:34 2017
50.24% done, estimate finish Mon Sep 25 11:04:34 2017
50.50% done, estimate finish Mon Sep 25 11:04:34 2017
50.76% done, estimate finish Mon Sep 25 11:04:34 2017
51.02% done, estimate finish Mon Sep 25 11:04:34 2017
51.27% done, estimate finish Mon Sep 25 11:04:34 2017
51.53% done, estimate finish Mon Sep 25 11:04:34 2017
51.79% done, estimate finish Mon Sep 25 11:04:34 2017
52.05% done, estimate finish Mon Sep 25 11:04:34 2017
52.31% done, estimate finish Mon Sep 25 11:04:34 2017
52.56% done, estimate finish Mon Sep 25 11:04:34 2017
52.82% done, estimate finish Mon Sep 25 11:04:34 2017
53.08% done, estimate finish Mon Sep 25 11:04:34 2017
53.34% done, estimate finish Mon Sep 25 11:04:34 2017
53.59% done, estimate finish Mon Sep 25 11:04:34 2017
53.85% done, estimate finish Mon Sep 25 11:04:34 2017
54.11% done, estimate finish Mon Sep 25 11:04:34 2017
54.36% done, estimate finish Mon Sep 25 11:04:34 2017
54.62% done, estimate finish Mon Sep 25 11:04:34 2017
54.88% done, estimate finish Mon Sep 25 11:04:34 2017
55.14% done, estimate finish Mon Sep 25 11:04:34 2017
55.40% done, estimate finish Mon Sep 25 11:04:34 2017
55.65% done, estimate finish Mon Sep 25 11:04:34 2017
55.91% done, estimate finish Mon Sep 25 11:04:34 2017
56.17% done, estimate finish Mon Sep 25 11:04:34 2017
56.42% done, estimate finish Mon Sep 25 11:04:34 2017
56.69% done, estimate finish Mon Sep 25 11:04:34 2017
56.94% done, estimate finish Mon Sep 25 11:04:34 2017
57.20% done, estimate finish Mon Sep 25 11:04:34 2017
57.45% done, estimate finish Mon Sep 25 11:04:34 2017
57.71% done, estimate finish Mon Sep 25 11:04:34 2017
57.98% done, estimate finish Mon Sep 25 11:04:34 2017
58.23% done, estimate finish Mon Sep 25 11:04:34 2017
58.49% done, estimate finish Mon Sep 25 11:04:34 2017
58.74% done, estimate finish Mon Sep 25 11:04:34 2017
59.00% done, estimate finish Mon Sep 25 11:04:34 2017
59.26% done, estimate finish Mon Sep 25 11:04:34 2017
59.52% done, estimate finish Mon Sep 25 11:04:34 2017
59.77% done, estimate finish Mon Sep 25 11:04:34 2017
60.03% done, estimate finish Mon Sep 25 11:04:34 2017
60.29% done, estimate finish Mon Sep 25 11:04:34 2017
60.55% done, estimate finish Mon Sep 25 11:04:34 2017
60.81% done, estimate finish Mon Sep 25 11:04:34 2017
61.06% done, estimate finish Mon Sep 25 11:04:34 2017
61.32% done, estimate finish Mon Sep 25 11:04:34 2017
61.58% done, estimate finish Mon Sep 25 11:04:34 2017
61.83% done, estimate finish Mon Sep 25 11:04:34 2017
62.10% done, estimate finish Mon Sep 25 11:04:34 2017
62.35% done, estimate finish Mon Sep 25 11:04:34 2017
62.61% done, estimate finish Mon Sep 25 11:04:34 2017
62.87% done, estimate finish Mon Sep 25 11:04:34 2017
63.13% done, estimate finish Mon Sep 25 11:04:34 2017
63.38% done, estimate finish Mon Sep 25 11:04:34 2017
63.64% done, estimate finish Mon Sep 25 11:04:34 2017
63.89% done, estimate finish Mon Sep 25 11:04:34 2017
64.16% done, estimate finish Mon Sep 25 11:04:34 2017
64.42% done, estimate finish Mon Sep 25 11:04:34 2017
64.67% done, estimate finish Mon Sep 25 11:04:34 2017
64.93% done, estimate finish Mon Sep 25 11:04:34 2017
65.18% done, estimate finish Mon Sep 25 11:04:34 2017
65.45% done, estimate finish Mon Sep 25 11:04:34 2017
65.70% done, estimate finish Mon Sep 25 11:04:34 2017
65.96% done, estimate finish Mon Sep 25 11:04:34 2017
66.21% done, estimate finish Mon Sep 25 11:04:34 2017
66.48% done, estimate finish Mon Sep 25 11:04:34 2017
66.73% done, estimate finish Mon Sep 25 11:04:34 2017
66.99% done, estimate finish Mon Sep 25 11:04:34 2017
67.24% done, estimate finish Mon Sep 25 11:04:34 2017
67.51% done, estimate finish Mon Sep 25 11:04:34 2017
67.76% done, estimate finish Mon Sep 25 11:04:34 2017
68.02% done, estimate finish Mon Sep 25 11:04:34 2017
68.28% done, estimate finish Mon Sep 25 11:04:34 2017
68.53% done, estimate finish Mon Sep 25 11:04:34 2017
68.79% done, estimate finish Mon Sep 25 11:04:34 2017
69.05% done, estimate finish Mon Sep 25 11:04:34 2017
69.30% done, estimate finish Mon Sep 25 11:04:34 2017
69.57% done, estimate finish Mon Sep 25 11:04:34 2017
69.83% done, estimate finish Mon Sep 25 11:04:34 2017
70.08% done, estimate finish Mon Sep 25 11:04:34 2017
70.34% done, estimate finish Mon Sep 25 11:04:34 2017
70.60% done, estimate finish Mon Sep 25 11:04:34 2017
70.85% done, estimate finish Mon Sep 25 11:04:34 2017
71.11% done, estimate finish Mon Sep 25 11:04:34 2017
71.37% done, estimate finish Mon Sep 25 11:04:34 2017
71.62% done, estimate finish Mon Sep 25 11:04:34 2017
71.89% done, estimate finish Mon Sep 25 11:04:34 2017
72.14% done, estimate finish Mon Sep 25 11:04:34 2017
72.40% done, estimate finish Mon Sep 25 11:04:34 2017
72.66% done, estimate finish Mon Sep 25 11:04:34 2017
72.92% done, estimate finish Mon Sep 25 11:04:34 2017
73.17% done, estimate finish Mon Sep 25 11:04:34 2017
73.43% done, estimate finish Mon Sep 25 11:04:34 2017
73.69% done, estimate finish Mon Sep 25 11:04:34 2017
73.94% done, estimate finish Mon Sep 25 11:04:34 2017
74.21% done, estimate finish Mon Sep 25 11:04:34 2017
74.46% done, estimate finish Mon Sep 25 11:04:34 2017
74.72% done, estimate finish Mon Sep 25 11:04:34 2017
74.98% done, estimate finish Mon Sep 25 11:04:34 2017
75.24% done, estimate finish Mon Sep 25 11:04:34 2017
75.49% done, estimate finish Mon Sep 25 11:04:34 2017
75.75% done, estimate finish Mon Sep 25 11:04:34 2017
76.00% done, estimate finish Mon Sep 25 11:04:34 2017
76.27% done, estimate finish Mon Sep 25 11:04:34 2017
76.52% done, estimate finish Mon Sep 25 11:04:34 2017
76.78% done, estimate finish Mon Sep 25 11:04:34 2017
77.04% done, estimate finish Mon Sep 25 11:04:34 2017
77.30% done, estimate finish Mon Sep 25 11:04:34 2017
77.55% done, estimate finish Mon Sep 25 11:04:34 2017
77.81% done, estimate finish Mon Sep 25 11:04:34 2017
78.07% done, estimate finish Mon Sep 25 11:04:34 2017
78.33% done, estimate finish Mon Sep 25 11:04:34 2017
78.59% done, estimate finish Mon Sep 25 11:04:34 2017
78.84% done, estimate finish Mon Sep 25 11:04:34 2017
79.10% done, estimate finish Mon Sep 25 11:04:34 2017
79.36% done, estimate finish Mon Sep 25 11:04:34 2017
79.61% done, estimate finish Mon Sep 25 11:04:34 2017
79.87% done, estimate finish Mon Sep 25 11:04:34 2017
80.13% done, estimate finish Mon Sep 25 11:04:34 2017
80.38% done, estimate finish Mon Sep 25 11:04:34 2017
80.65% done, estimate finish Mon Sep 25 11:04:34 2017
80.91% done, estimate finish Mon Sep 25 11:04:34 2017
81.16% done, estimate finish Mon Sep 25 11:04:34 2017
81.42% done, estimate finish Mon Sep 25 11:04:34 2017
81.68% done, estimate finish Mon Sep 25 11:04:34 2017
81.93% done, estimate finish Mon Sep 25 11:04:34 2017
82.19% done, estimate finish Mon Sep 25 11:04:34 2017
82.45% done, estimate finish Mon Sep 25 11:04:34 2017
82.70% done, estimate finish Mon Sep 25 11:04:34 2017
82.97% done, estimate finish Mon Sep 25 11:04:34 2017
83.22% done, estimate finish Mon Sep 25 11:04:34 2017
83.48% done, estimate finish Mon Sep 25 11:04:34 2017
83.73% done, estimate finish Mon Sep 25 11:04:34 2017
84.00% done, estimate finish Mon Sep 25 11:04:34 2017
84.25% done, estimate finish Mon Sep 25 11:04:34 2017
84.51% done, estimate finish Mon Sep 25 11:04:34 2017
84.77% done, estimate finish Mon Sep 25 11:04:34 2017
85.02% done, estimate finish Mon Sep 25 11:04:34 2017
85.28% done, estimate finish Mon Sep 25 11:04:34 2017
85.54% done, estimate finish Mon Sep 25 11:04:34 2017
85.80% done, estimate finish Mon Sep 25 11:04:34 2017
86.05% done, estimate finish Mon Sep 25 11:04:34 2017
86.31% done, estimate finish Mon Sep 25 11:04:34 2017
86.57% done, estimate finish Mon Sep 25 11:04:34 2017
86.83% done, estimate finish Mon Sep 25 11:04:34 2017
87.09% done, estimate finish Mon Sep 25 11:04:34 2017
87.34% done, estimate finish Mon Sep 25 11:04:34 2017
87.60% done, estimate finish Mon Sep 25 11:04:34 2017
87.86% done, estimate finish Mon Sep 25 11:04:34 2017
88.12% done, estimate finish Mon Sep 25 11:04:34 2017
88.37% done, estimate finish Mon Sep 25 11:04:34 2017
88.63% done, estimate finish Mon Sep 25 11:04:34 2017
88.89% done, estimate finish Mon Sep 25 11:04:34 2017
89.15% done, estimate finish Mon Sep 25 11:04:34 2017
89.40% done, estimate finish Mon Sep 25 11:04:34 2017
89.66% done, estimate finish Mon Sep 25 11:04:34 2017
89.92% done, estimate finish Mon Sep 25 11:04:34 2017
90.18% done, estimate finish Mon Sep 25 11:04:34 2017
90.43% done, estimate finish Mon Sep 25 11:04:34 2017
90.70% done, estimate finish Mon Sep 25 11:04:34 2017
90.95% done, estimate finish Mon Sep 25 11:04:34 2017
91.21% done, estimate finish Mon Sep 25 11:04:34 2017
91.46% done, estimate finish Mon Sep 25 11:04:34 2017
91.72% done, estimate finish Mon Sep 25 11:04:34 2017
91.98% done, estimate finish Mon Sep 25 11:04:34 2017
92.24% done, estimate finish Mon Sep 25 11:04:34 2017
92.50% done, estimate finish Mon Sep 25 11:04:34 2017
92.75% done, estimate finish Mon Sep 25 11:04:34 2017
93.01% done, estimate finish Mon Sep 25 11:04:34 2017
93.27% done, estimate finish Mon Sep 25 11:04:34 2017
93.53% done, estimate finish Mon Sep 25 11:04:34 2017
93.78% done, estimate finish Mon Sep 25 11:04:34 2017
94.04% done, estimate finish Mon Sep 25 11:04:34 2017
94.30% done, estimate finish Mon Sep 25 11:04:34 2017
94.56% done, estimate finish Mon Sep 25 11:04:34 2017
94.81% done, estimate finish Mon Sep 25 11:04:34 2017
95.07% done, estimate finish Mon Sep 25 11:04:34 2017
95.33% done, estimate finish Mon Sep 25 11:04:34 2017
95.59% done, estimate finish Mon Sep 25 11:04:34 2017
95.84% done, estimate finish Mon Sep 25 11:04:34 2017
96.11% done, estimate finish Mon Sep 25 11:04:34 2017
96.36% done, estimate finish Mon Sep 25 11:04:34 2017
96.62% done, estimate finish Mon Sep 25 11:04:34 2017
96.87% done, estimate finish Mon Sep 25 11:04:34 2017
97.14% done, estimate finish Mon Sep 25 11:04:34 2017
97.39% done, estimate finish Mon Sep 25 11:04:34 2017
97.65% done, estimate finish Mon Sep 25 11:04:34 2017
97.90% done, estimate finish Mon Sep 25 11:04:34 2017
98.17% done, estimate finish Mon Sep 25 11:04:34 2017
98.42% done, estimate finish Mon Sep 25 11:04:34 2017
98.68% done, estimate finish Mon Sep 25 11:04:34 2017
98.93% done, estimate finish Mon Sep 25 11:04:34 2017
99.20% done, estimate finish Mon Sep 25 11:04:34 2017
99.45% done, estimate finish Mon Sep 25 11:04:34 2017
99.71% done, estimate finish Mon Sep 25 11:04:34 2017
Total translation table size: 0
Total rockridge attributes bytes: 141718
Total directory bytes: 567666
Path table size(bytes): 4300
Max brk space used 140000
194070 extents written (379 MB)
mkisofs calculate size command:
-----------------------
/usr/bin/genisoimage -gui -graft-points -print-size -quiet -volid AMDAPPSDK-3
-volset -appid K3B THE CD KREATOR (C) 1998-2017 SEBASTIAN TRUEG, MICHAL MALEK
AND LESLIE ZHAI -publisher -preparer -sysid LINUX -volset-size 1
-volset-seqno 1 -sort /tmp/k3b.c25711 -rational-rock -hide-list /tmp/k3b.a25711
-joliet -joliet-long -hide-joliet-list /tmp/k3b.S25711 -no-cache-inodes
-full-iso9660-filenames -disable-deep-relocation -iso-level 3 -path-list
/tmp/k3b.q25711
mkisofs command:
-----------------------
/usr/bin/genisoimage -gui -graft-points -volid AMDAPPSDK-3 -volset -appid K3B
THE CD KREATOR (C) 1998-2017 SEBASTIAN TRUEG, MICHAL MALEK AND LESLIE ZHAI
-publisher -preparer -sysid LINUX -volset-size 1 -volset-seqno 1 -sort
/tmp/k3b.b25711 -rational-rock -hide-list /tmp/k3b.c25711 -joliet -joliet-long
-hide-joliet-list /tmp/k3b.h25711 -no-cache-inodes -full-iso9660-filenames
-disable-deep-relocation -iso-level 3 -path-list /tmp/k3b.F25711
so the testcase 'create a data project' can *not* reproduce the issue.
--
You are receiving this mail because:
You are the assignee for the bug.
More information about the k3b
mailing list