[k3b] [Bug 384750] Progress bars don't work when I save a project to an ISO file

Leslie Zhai bugzilla_noreply at kde.org
Mon Sep 25 03:06:38 UTC 2017


https://bugs.kde.org/show_bug.cgi?id=384750

--- Comment #5 from Leslie Zhai <lesliezhai at llvm.org.cn> ---
but it updates the percentage for me:


K3b::IsoImager
-----------------------
mkisofs print size result: 194070 (397455360 bytes)

System
-----------------------
K3b Version: 17.11.70
KDE Version: 5.36.0
Qt Version:  5.7.1
Kernel:      4.12.11-200.fc25.x86_64

Used versions
-----------------------
mkisofs: 1.1.11

mkisofs
-----------------------
194070
I: -input-charset not specified, using utf-8 (detected in locale settings)
Using CMAKEDETERMINECOMPILERAB000.BIN;1 for 
AMDAPPSDK-3.0/samples/opencl/cl/1.x/HelloWorld/build/CMakeFiles/3.9.0/CMakeDetermineCompilerABI_CXX.bin
(CMakeDetermineCompilerABI_C.bin)
  0.52% done, estimate finish Mon Sep 25 11:04:34 2017
  0.77% done, estimate finish Mon Sep 25 11:04:34 2017
  1.04% done, estimate finish Mon Sep 25 11:04:34 2017
  1.29% done, estimate finish Mon Sep 25 11:04:34 2017
  1.55% done, estimate finish Mon Sep 25 11:04:34 2017
  1.81% done, estimate finish Mon Sep 25 11:04:34 2017
  2.07% done, estimate finish Mon Sep 25 11:04:34 2017
  2.32% done, estimate finish Mon Sep 25 11:04:34 2017
  2.58% done, estimate finish Mon Sep 25 11:04:34 2017
  2.83% done, estimate finish Mon Sep 25 11:04:34 2017
  3.10% done, estimate finish Mon Sep 25 11:04:34 2017
  3.35% done, estimate finish Mon Sep 25 11:04:34 2017
  3.61% done, estimate finish Mon Sep 25 11:04:34 2017
  3.87% done, estimate finish Mon Sep 25 11:04:34 2017
  4.13% done, estimate finish Mon Sep 25 11:04:34 2017
  4.38% done, estimate finish Mon Sep 25 11:04:34 2017
  4.64% done, estimate finish Mon Sep 25 11:04:34 2017
  4.90% done, estimate finish Mon Sep 25 11:04:34 2017
  5.16% done, estimate finish Mon Sep 25 11:04:34 2017
  5.42% done, estimate finish Mon Sep 25 11:04:34 2017
  5.67% done, estimate finish Mon Sep 25 11:04:34 2017
  5.93% done, estimate finish Mon Sep 25 11:04:34 2017
  6.19% done, estimate finish Mon Sep 25 11:04:34 2017
  6.45% done, estimate finish Mon Sep 25 11:04:34 2017
  6.70% done, estimate finish Mon Sep 25 11:04:34 2017
  6.96% done, estimate finish Mon Sep 25 11:04:34 2017
  7.22% done, estimate finish Mon Sep 25 11:04:34 2017
  7.48% done, estimate finish Mon Sep 25 11:04:34 2017
  7.73% done, estimate finish Mon Sep 25 11:04:34 2017
  7.99% done, estimate finish Mon Sep 25 11:04:34 2017
  8.25% done, estimate finish Mon Sep 25 11:04:34 2017
  8.51% done, estimate finish Mon Sep 25 11:04:34 2017
  8.76% done, estimate finish Mon Sep 25 11:04:34 2017
  9.02% done, estimate finish Mon Sep 25 11:04:34 2017
  9.28% done, estimate finish Mon Sep 25 11:04:34 2017
  9.54% done, estimate finish Mon Sep 25 11:04:34 2017
  9.79% done, estimate finish Mon Sep 25 11:04:34 2017
 10.05% done, estimate finish Mon Sep 25 11:04:34 2017
 10.31% done, estimate finish Mon Sep 25 11:04:34 2017
 10.57% done, estimate finish Mon Sep 25 11:04:34 2017
 10.82% done, estimate finish Mon Sep 25 11:04:34 2017
 11.08% done, estimate finish Mon Sep 25 11:04:34 2017
 11.34% done, estimate finish Mon Sep 25 11:04:34 2017
 11.60% done, estimate finish Mon Sep 25 11:04:34 2017
 11.86% done, estimate finish Mon Sep 25 11:04:34 2017
 12.11% done, estimate finish Mon Sep 25 11:04:34 2017
 12.37% done, estimate finish Mon Sep 25 11:04:34 2017
 12.63% done, estimate finish Mon Sep 25 11:04:34 2017
 12.89% done, estimate finish Mon Sep 25 11:04:34 2017
 13.14% done, estimate finish Mon Sep 25 11:04:34 2017
 13.40% done, estimate finish Mon Sep 25 11:04:34 2017
 13.66% done, estimate finish Mon Sep 25 11:04:34 2017
 13.92% done, estimate finish Mon Sep 25 11:04:34 2017
 14.17% done, estimate finish Mon Sep 25 11:04:34 2017
 14.44% done, estimate finish Mon Sep 25 11:04:34 2017
 14.69% done, estimate finish Mon Sep 25 11:04:34 2017
 14.95% done, estimate finish Mon Sep 25 11:04:34 2017
 15.20% done, estimate finish Mon Sep 25 11:04:34 2017
 15.47% done, estimate finish Mon Sep 25 11:04:34 2017
 15.72% done, estimate finish Mon Sep 25 11:04:34 2017
 15.98% done, estimate finish Mon Sep 25 11:04:34 2017
 16.23% done, estimate finish Mon Sep 25 11:04:34 2017
 16.50% done, estimate finish Mon Sep 25 11:04:34 2017
 16.75% done, estimate finish Mon Sep 25 11:04:34 2017
 17.01% done, estimate finish Mon Sep 25 11:04:34 2017
 17.26% done, estimate finish Mon Sep 25 11:04:34 2017
 17.53% done, estimate finish Mon Sep 25 11:04:34 2017
 17.78% done, estimate finish Mon Sep 25 11:04:34 2017
 18.04% done, estimate finish Mon Sep 25 11:04:34 2017
 18.29% done, estimate finish Mon Sep 25 11:04:34 2017
 18.56% done, estimate finish Mon Sep 25 11:04:34 2017
 18.81% done, estimate finish Mon Sep 25 11:04:34 2017
 19.07% done, estimate finish Mon Sep 25 11:04:34 2017
 19.32% done, estimate finish Mon Sep 25 11:04:34 2017
 19.59% done, estimate finish Mon Sep 25 11:04:34 2017
 19.84% done, estimate finish Mon Sep 25 11:04:34 2017
 20.10% done, estimate finish Mon Sep 25 11:04:34 2017
 20.36% done, estimate finish Mon Sep 25 11:04:34 2017
 20.62% done, estimate finish Mon Sep 25 11:04:34 2017
 20.87% done, estimate finish Mon Sep 25 11:04:34 2017
 21.13% done, estimate finish Mon Sep 25 11:04:34 2017
 21.39% done, estimate finish Mon Sep 25 11:04:34 2017
 21.65% done, estimate finish Mon Sep 25 11:04:34 2017
 21.90% done, estimate finish Mon Sep 25 11:04:34 2017
 22.16% done, estimate finish Mon Sep 25 11:04:34 2017
 22.42% done, estimate finish Mon Sep 25 11:04:34 2017
 22.68% done, estimate finish Mon Sep 25 11:04:34 2017
 22.94% done, estimate finish Mon Sep 25 11:04:34 2017
 23.19% done, estimate finish Mon Sep 25 11:04:34 2017
 23.45% done, estimate finish Mon Sep 25 11:04:34 2017
 23.71% done, estimate finish Mon Sep 25 11:04:34 2017
 23.97% done, estimate finish Mon Sep 25 11:04:34 2017
 24.22% done, estimate finish Mon Sep 25 11:04:34 2017
 24.48% done, estimate finish Mon Sep 25 11:04:34 2017
 24.74% done, estimate finish Mon Sep 25 11:04:34 2017
 25.00% done, estimate finish Mon Sep 25 11:04:34 2017
 25.25% done, estimate finish Mon Sep 25 11:04:34 2017
 25.51% done, estimate finish Mon Sep 25 11:04:34 2017
 25.77% done, estimate finish Mon Sep 25 11:04:34 2017
 26.03% done, estimate finish Mon Sep 25 11:04:34 2017
 26.28% done, estimate finish Mon Sep 25 11:04:34 2017
 26.54% done, estimate finish Mon Sep 25 11:04:34 2017
 26.80% done, estimate finish Mon Sep 25 11:04:34 2017
 27.06% done, estimate finish Mon Sep 25 11:04:34 2017
 27.32% done, estimate finish Mon Sep 25 11:04:34 2017
 27.57% done, estimate finish Mon Sep 25 11:04:34 2017
 27.83% done, estimate finish Mon Sep 25 11:04:34 2017
 28.09% done, estimate finish Mon Sep 25 11:04:34 2017
 28.34% done, estimate finish Mon Sep 25 11:04:34 2017
 28.60% done, estimate finish Mon Sep 25 11:04:34 2017
 28.86% done, estimate finish Mon Sep 25 11:04:34 2017
 29.12% done, estimate finish Mon Sep 25 11:04:34 2017
 29.37% done, estimate finish Mon Sep 25 11:04:34 2017
 29.63% done, estimate finish Mon Sep 25 11:04:34 2017
 29.89% done, estimate finish Mon Sep 25 11:04:34 2017
 30.15% done, estimate finish Mon Sep 25 11:04:34 2017
 30.41% done, estimate finish Mon Sep 25 11:04:34 2017
 30.66% done, estimate finish Mon Sep 25 11:04:34 2017
 30.92% done, estimate finish Mon Sep 25 11:04:34 2017
 31.18% done, estimate finish Mon Sep 25 11:04:34 2017
 31.44% done, estimate finish Mon Sep 25 11:04:34 2017
 31.69% done, estimate finish Mon Sep 25 11:04:34 2017
 31.95% done, estimate finish Mon Sep 25 11:04:34 2017
 32.21% done, estimate finish Mon Sep 25 11:04:34 2017
 32.47% done, estimate finish Mon Sep 25 11:04:34 2017
 32.72% done, estimate finish Mon Sep 25 11:04:34 2017
 32.98% done, estimate finish Mon Sep 25 11:04:34 2017
 33.24% done, estimate finish Mon Sep 25 11:04:34 2017
 33.50% done, estimate finish Mon Sep 25 11:04:34 2017
 33.75% done, estimate finish Mon Sep 25 11:04:34 2017
 34.01% done, estimate finish Mon Sep 25 11:04:34 2017
 34.27% done, estimate finish Mon Sep 25 11:04:34 2017
 34.53% done, estimate finish Mon Sep 25 11:04:34 2017
 34.78% done, estimate finish Mon Sep 25 11:04:34 2017
 35.04% done, estimate finish Mon Sep 25 11:04:34 2017
 35.30% done, estimate finish Mon Sep 25 11:04:34 2017
 35.56% done, estimate finish Mon Sep 25 11:04:34 2017
 35.81% done, estimate finish Mon Sep 25 11:04:34 2017
 36.07% done, estimate finish Mon Sep 25 11:04:34 2017
 36.33% done, estimate finish Mon Sep 25 11:04:34 2017
 36.59% done, estimate finish Mon Sep 25 11:04:34 2017
 36.85% done, estimate finish Mon Sep 25 11:04:34 2017
 37.10% done, estimate finish Mon Sep 25 11:04:34 2017
 37.36% done, estimate finish Mon Sep 25 11:04:34 2017
 37.62% done, estimate finish Mon Sep 25 11:04:34 2017
 37.88% done, estimate finish Mon Sep 25 11:04:34 2017
 38.13% done, estimate finish Mon Sep 25 11:04:34 2017
 38.39% done, estimate finish Mon Sep 25 11:04:34 2017
 38.65% done, estimate finish Mon Sep 25 11:04:34 2017
 38.91% done, estimate finish Mon Sep 25 11:04:34 2017
 39.16% done, estimate finish Mon Sep 25 11:04:34 2017
 39.42% done, estimate finish Mon Sep 25 11:04:34 2017
 39.68% done, estimate finish Mon Sep 25 11:04:34 2017
 39.94% done, estimate finish Mon Sep 25 11:04:34 2017
 40.19% done, estimate finish Mon Sep 25 11:04:34 2017
 40.45% done, estimate finish Mon Sep 25 11:04:34 2017
 40.71% done, estimate finish Mon Sep 25 11:04:34 2017
 40.97% done, estimate finish Mon Sep 25 11:04:34 2017
 41.22% done, estimate finish Mon Sep 25 11:04:34 2017
 41.48% done, estimate finish Mon Sep 25 11:04:34 2017
 41.74% done, estimate finish Mon Sep 25 11:04:34 2017
 42.00% done, estimate finish Mon Sep 25 11:04:34 2017
 42.26% done, estimate finish Mon Sep 25 11:04:34 2017
 42.51% done, estimate finish Mon Sep 25 11:04:34 2017
 42.77% done, estimate finish Mon Sep 25 11:04:34 2017
 43.03% done, estimate finish Mon Sep 25 11:04:34 2017
 43.29% done, estimate finish Mon Sep 25 11:04:34 2017
 43.54% done, estimate finish Mon Sep 25 11:04:34 2017
 43.81% done, estimate finish Mon Sep 25 11:04:34 2017
 44.06% done, estimate finish Mon Sep 25 11:04:34 2017
 44.32% done, estimate finish Mon Sep 25 11:04:34 2017
 44.57% done, estimate finish Mon Sep 25 11:04:34 2017
 44.84% done, estimate finish Mon Sep 25 11:04:34 2017
 45.09% done, estimate finish Mon Sep 25 11:04:34 2017
 45.35% done, estimate finish Mon Sep 25 11:04:34 2017
 45.60% done, estimate finish Mon Sep 25 11:04:34 2017
 45.87% done, estimate finish Mon Sep 25 11:04:34 2017
 46.12% done, estimate finish Mon Sep 25 11:04:34 2017
 46.38% done, estimate finish Mon Sep 25 11:04:34 2017
 46.63% done, estimate finish Mon Sep 25 11:04:34 2017
 46.90% done, estimate finish Mon Sep 25 11:04:34 2017
 47.15% done, estimate finish Mon Sep 25 11:04:34 2017
 47.41% done, estimate finish Mon Sep 25 11:04:34 2017
 47.66% done, estimate finish Mon Sep 25 11:04:34 2017
 47.93% done, estimate finish Mon Sep 25 11:04:34 2017
 48.18% done, estimate finish Mon Sep 25 11:04:34 2017
 48.44% done, estimate finish Mon Sep 25 11:04:34 2017
 48.69% done, estimate finish Mon Sep 25 11:04:34 2017
 48.96% done, estimate finish Mon Sep 25 11:04:34 2017
 49.21% done, estimate finish Mon Sep 25 11:04:34 2017
 49.47% done, estimate finish Mon Sep 25 11:04:34 2017
 49.72% done, estimate finish Mon Sep 25 11:04:34 2017
 49.99% done, estimate finish Mon Sep 25 11:04:34 2017
 50.24% done, estimate finish Mon Sep 25 11:04:34 2017
 50.50% done, estimate finish Mon Sep 25 11:04:34 2017
 50.76% done, estimate finish Mon Sep 25 11:04:34 2017
 51.02% done, estimate finish Mon Sep 25 11:04:34 2017
 51.27% done, estimate finish Mon Sep 25 11:04:34 2017
 51.53% done, estimate finish Mon Sep 25 11:04:34 2017
 51.79% done, estimate finish Mon Sep 25 11:04:34 2017
 52.05% done, estimate finish Mon Sep 25 11:04:34 2017
 52.31% done, estimate finish Mon Sep 25 11:04:34 2017
 52.56% done, estimate finish Mon Sep 25 11:04:34 2017
 52.82% done, estimate finish Mon Sep 25 11:04:34 2017
 53.08% done, estimate finish Mon Sep 25 11:04:34 2017
 53.34% done, estimate finish Mon Sep 25 11:04:34 2017
 53.59% done, estimate finish Mon Sep 25 11:04:34 2017
 53.85% done, estimate finish Mon Sep 25 11:04:34 2017
 54.11% done, estimate finish Mon Sep 25 11:04:34 2017
 54.36% done, estimate finish Mon Sep 25 11:04:34 2017
 54.62% done, estimate finish Mon Sep 25 11:04:34 2017
 54.88% done, estimate finish Mon Sep 25 11:04:34 2017
 55.14% done, estimate finish Mon Sep 25 11:04:34 2017
 55.40% done, estimate finish Mon Sep 25 11:04:34 2017
 55.65% done, estimate finish Mon Sep 25 11:04:34 2017
 55.91% done, estimate finish Mon Sep 25 11:04:34 2017
 56.17% done, estimate finish Mon Sep 25 11:04:34 2017
 56.42% done, estimate finish Mon Sep 25 11:04:34 2017
 56.69% done, estimate finish Mon Sep 25 11:04:34 2017
 56.94% done, estimate finish Mon Sep 25 11:04:34 2017
 57.20% done, estimate finish Mon Sep 25 11:04:34 2017
 57.45% done, estimate finish Mon Sep 25 11:04:34 2017
 57.71% done, estimate finish Mon Sep 25 11:04:34 2017
 57.98% done, estimate finish Mon Sep 25 11:04:34 2017
 58.23% done, estimate finish Mon Sep 25 11:04:34 2017
 58.49% done, estimate finish Mon Sep 25 11:04:34 2017
 58.74% done, estimate finish Mon Sep 25 11:04:34 2017
 59.00% done, estimate finish Mon Sep 25 11:04:34 2017
 59.26% done, estimate finish Mon Sep 25 11:04:34 2017
 59.52% done, estimate finish Mon Sep 25 11:04:34 2017
 59.77% done, estimate finish Mon Sep 25 11:04:34 2017
 60.03% done, estimate finish Mon Sep 25 11:04:34 2017
 60.29% done, estimate finish Mon Sep 25 11:04:34 2017
 60.55% done, estimate finish Mon Sep 25 11:04:34 2017
 60.81% done, estimate finish Mon Sep 25 11:04:34 2017
 61.06% done, estimate finish Mon Sep 25 11:04:34 2017
 61.32% done, estimate finish Mon Sep 25 11:04:34 2017
 61.58% done, estimate finish Mon Sep 25 11:04:34 2017
 61.83% done, estimate finish Mon Sep 25 11:04:34 2017
 62.10% done, estimate finish Mon Sep 25 11:04:34 2017
 62.35% done, estimate finish Mon Sep 25 11:04:34 2017
 62.61% done, estimate finish Mon Sep 25 11:04:34 2017
 62.87% done, estimate finish Mon Sep 25 11:04:34 2017
 63.13% done, estimate finish Mon Sep 25 11:04:34 2017
 63.38% done, estimate finish Mon Sep 25 11:04:34 2017
 63.64% done, estimate finish Mon Sep 25 11:04:34 2017
 63.89% done, estimate finish Mon Sep 25 11:04:34 2017
 64.16% done, estimate finish Mon Sep 25 11:04:34 2017
 64.42% done, estimate finish Mon Sep 25 11:04:34 2017
 64.67% done, estimate finish Mon Sep 25 11:04:34 2017
 64.93% done, estimate finish Mon Sep 25 11:04:34 2017
 65.18% done, estimate finish Mon Sep 25 11:04:34 2017
 65.45% done, estimate finish Mon Sep 25 11:04:34 2017
 65.70% done, estimate finish Mon Sep 25 11:04:34 2017
 65.96% done, estimate finish Mon Sep 25 11:04:34 2017
 66.21% done, estimate finish Mon Sep 25 11:04:34 2017
 66.48% done, estimate finish Mon Sep 25 11:04:34 2017
 66.73% done, estimate finish Mon Sep 25 11:04:34 2017
 66.99% done, estimate finish Mon Sep 25 11:04:34 2017
 67.24% done, estimate finish Mon Sep 25 11:04:34 2017
 67.51% done, estimate finish Mon Sep 25 11:04:34 2017
 67.76% done, estimate finish Mon Sep 25 11:04:34 2017
 68.02% done, estimate finish Mon Sep 25 11:04:34 2017
 68.28% done, estimate finish Mon Sep 25 11:04:34 2017
 68.53% done, estimate finish Mon Sep 25 11:04:34 2017
 68.79% done, estimate finish Mon Sep 25 11:04:34 2017
 69.05% done, estimate finish Mon Sep 25 11:04:34 2017
 69.30% done, estimate finish Mon Sep 25 11:04:34 2017
 69.57% done, estimate finish Mon Sep 25 11:04:34 2017
 69.83% done, estimate finish Mon Sep 25 11:04:34 2017
 70.08% done, estimate finish Mon Sep 25 11:04:34 2017
 70.34% done, estimate finish Mon Sep 25 11:04:34 2017
 70.60% done, estimate finish Mon Sep 25 11:04:34 2017
 70.85% done, estimate finish Mon Sep 25 11:04:34 2017
 71.11% done, estimate finish Mon Sep 25 11:04:34 2017
 71.37% done, estimate finish Mon Sep 25 11:04:34 2017
 71.62% done, estimate finish Mon Sep 25 11:04:34 2017
 71.89% done, estimate finish Mon Sep 25 11:04:34 2017
 72.14% done, estimate finish Mon Sep 25 11:04:34 2017
 72.40% done, estimate finish Mon Sep 25 11:04:34 2017
 72.66% done, estimate finish Mon Sep 25 11:04:34 2017
 72.92% done, estimate finish Mon Sep 25 11:04:34 2017
 73.17% done, estimate finish Mon Sep 25 11:04:34 2017
 73.43% done, estimate finish Mon Sep 25 11:04:34 2017
 73.69% done, estimate finish Mon Sep 25 11:04:34 2017
 73.94% done, estimate finish Mon Sep 25 11:04:34 2017
 74.21% done, estimate finish Mon Sep 25 11:04:34 2017
 74.46% done, estimate finish Mon Sep 25 11:04:34 2017
 74.72% done, estimate finish Mon Sep 25 11:04:34 2017
 74.98% done, estimate finish Mon Sep 25 11:04:34 2017
 75.24% done, estimate finish Mon Sep 25 11:04:34 2017
 75.49% done, estimate finish Mon Sep 25 11:04:34 2017
 75.75% done, estimate finish Mon Sep 25 11:04:34 2017
 76.00% done, estimate finish Mon Sep 25 11:04:34 2017
 76.27% done, estimate finish Mon Sep 25 11:04:34 2017
 76.52% done, estimate finish Mon Sep 25 11:04:34 2017
 76.78% done, estimate finish Mon Sep 25 11:04:34 2017
 77.04% done, estimate finish Mon Sep 25 11:04:34 2017
 77.30% done, estimate finish Mon Sep 25 11:04:34 2017
 77.55% done, estimate finish Mon Sep 25 11:04:34 2017
 77.81% done, estimate finish Mon Sep 25 11:04:34 2017
 78.07% done, estimate finish Mon Sep 25 11:04:34 2017
 78.33% done, estimate finish Mon Sep 25 11:04:34 2017
 78.59% done, estimate finish Mon Sep 25 11:04:34 2017
 78.84% done, estimate finish Mon Sep 25 11:04:34 2017
 79.10% done, estimate finish Mon Sep 25 11:04:34 2017
 79.36% done, estimate finish Mon Sep 25 11:04:34 2017
 79.61% done, estimate finish Mon Sep 25 11:04:34 2017
 79.87% done, estimate finish Mon Sep 25 11:04:34 2017
 80.13% done, estimate finish Mon Sep 25 11:04:34 2017
 80.38% done, estimate finish Mon Sep 25 11:04:34 2017
 80.65% done, estimate finish Mon Sep 25 11:04:34 2017
 80.91% done, estimate finish Mon Sep 25 11:04:34 2017
 81.16% done, estimate finish Mon Sep 25 11:04:34 2017
 81.42% done, estimate finish Mon Sep 25 11:04:34 2017
 81.68% done, estimate finish Mon Sep 25 11:04:34 2017
 81.93% done, estimate finish Mon Sep 25 11:04:34 2017
 82.19% done, estimate finish Mon Sep 25 11:04:34 2017
 82.45% done, estimate finish Mon Sep 25 11:04:34 2017
 82.70% done, estimate finish Mon Sep 25 11:04:34 2017
 82.97% done, estimate finish Mon Sep 25 11:04:34 2017
 83.22% done, estimate finish Mon Sep 25 11:04:34 2017
 83.48% done, estimate finish Mon Sep 25 11:04:34 2017
 83.73% done, estimate finish Mon Sep 25 11:04:34 2017
 84.00% done, estimate finish Mon Sep 25 11:04:34 2017
 84.25% done, estimate finish Mon Sep 25 11:04:34 2017
 84.51% done, estimate finish Mon Sep 25 11:04:34 2017
 84.77% done, estimate finish Mon Sep 25 11:04:34 2017
 85.02% done, estimate finish Mon Sep 25 11:04:34 2017
 85.28% done, estimate finish Mon Sep 25 11:04:34 2017
 85.54% done, estimate finish Mon Sep 25 11:04:34 2017
 85.80% done, estimate finish Mon Sep 25 11:04:34 2017
 86.05% done, estimate finish Mon Sep 25 11:04:34 2017
 86.31% done, estimate finish Mon Sep 25 11:04:34 2017
 86.57% done, estimate finish Mon Sep 25 11:04:34 2017
 86.83% done, estimate finish Mon Sep 25 11:04:34 2017
 87.09% done, estimate finish Mon Sep 25 11:04:34 2017
 87.34% done, estimate finish Mon Sep 25 11:04:34 2017
 87.60% done, estimate finish Mon Sep 25 11:04:34 2017
 87.86% done, estimate finish Mon Sep 25 11:04:34 2017
 88.12% done, estimate finish Mon Sep 25 11:04:34 2017
 88.37% done, estimate finish Mon Sep 25 11:04:34 2017
 88.63% done, estimate finish Mon Sep 25 11:04:34 2017
 88.89% done, estimate finish Mon Sep 25 11:04:34 2017
 89.15% done, estimate finish Mon Sep 25 11:04:34 2017
 89.40% done, estimate finish Mon Sep 25 11:04:34 2017
 89.66% done, estimate finish Mon Sep 25 11:04:34 2017
 89.92% done, estimate finish Mon Sep 25 11:04:34 2017
 90.18% done, estimate finish Mon Sep 25 11:04:34 2017
 90.43% done, estimate finish Mon Sep 25 11:04:34 2017
 90.70% done, estimate finish Mon Sep 25 11:04:34 2017
 90.95% done, estimate finish Mon Sep 25 11:04:34 2017
 91.21% done, estimate finish Mon Sep 25 11:04:34 2017
 91.46% done, estimate finish Mon Sep 25 11:04:34 2017
 91.72% done, estimate finish Mon Sep 25 11:04:34 2017
 91.98% done, estimate finish Mon Sep 25 11:04:34 2017
 92.24% done, estimate finish Mon Sep 25 11:04:34 2017
 92.50% done, estimate finish Mon Sep 25 11:04:34 2017
 92.75% done, estimate finish Mon Sep 25 11:04:34 2017
 93.01% done, estimate finish Mon Sep 25 11:04:34 2017
 93.27% done, estimate finish Mon Sep 25 11:04:34 2017
 93.53% done, estimate finish Mon Sep 25 11:04:34 2017
 93.78% done, estimate finish Mon Sep 25 11:04:34 2017
 94.04% done, estimate finish Mon Sep 25 11:04:34 2017
 94.30% done, estimate finish Mon Sep 25 11:04:34 2017
 94.56% done, estimate finish Mon Sep 25 11:04:34 2017
 94.81% done, estimate finish Mon Sep 25 11:04:34 2017
 95.07% done, estimate finish Mon Sep 25 11:04:34 2017
 95.33% done, estimate finish Mon Sep 25 11:04:34 2017
 95.59% done, estimate finish Mon Sep 25 11:04:34 2017
 95.84% done, estimate finish Mon Sep 25 11:04:34 2017
 96.11% done, estimate finish Mon Sep 25 11:04:34 2017
 96.36% done, estimate finish Mon Sep 25 11:04:34 2017
 96.62% done, estimate finish Mon Sep 25 11:04:34 2017
 96.87% done, estimate finish Mon Sep 25 11:04:34 2017
 97.14% done, estimate finish Mon Sep 25 11:04:34 2017
 97.39% done, estimate finish Mon Sep 25 11:04:34 2017
 97.65% done, estimate finish Mon Sep 25 11:04:34 2017
 97.90% done, estimate finish Mon Sep 25 11:04:34 2017
 98.17% done, estimate finish Mon Sep 25 11:04:34 2017
 98.42% done, estimate finish Mon Sep 25 11:04:34 2017
 98.68% done, estimate finish Mon Sep 25 11:04:34 2017
 98.93% done, estimate finish Mon Sep 25 11:04:34 2017
 99.20% done, estimate finish Mon Sep 25 11:04:34 2017
 99.45% done, estimate finish Mon Sep 25 11:04:34 2017
 99.71% done, estimate finish Mon Sep 25 11:04:34 2017
Total translation table size: 0
Total rockridge attributes bytes: 141718
Total directory bytes: 567666
Path table size(bytes): 4300
Max brk space used 140000
194070 extents written (379 MB)

mkisofs calculate size command:
-----------------------
/usr/bin/genisoimage -gui -graft-points -print-size -quiet -volid AMDAPPSDK-3
-volset  -appid K3B THE CD KREATOR (C) 1998-2017 SEBASTIAN TRUEG, MICHAL MALEK
AND LESLIE ZHAI -publisher  -preparer  -sysid LINUX -volset-size 1
-volset-seqno 1 -sort /tmp/k3b.c25711 -rational-rock -hide-list /tmp/k3b.a25711
-joliet -joliet-long -hide-joliet-list /tmp/k3b.S25711 -no-cache-inodes
-full-iso9660-filenames -disable-deep-relocation -iso-level 3 -path-list
/tmp/k3b.q25711

mkisofs command:
-----------------------
/usr/bin/genisoimage -gui -graft-points -volid AMDAPPSDK-3 -volset  -appid K3B
THE CD KREATOR (C) 1998-2017 SEBASTIAN TRUEG, MICHAL MALEK AND LESLIE ZHAI
-publisher  -preparer  -sysid LINUX -volset-size 1 -volset-seqno 1 -sort
/tmp/k3b.b25711 -rational-rock -hide-list /tmp/k3b.c25711 -joliet -joliet-long
-hide-joliet-list /tmp/k3b.h25711 -no-cache-inodes -full-iso9660-filenames
-disable-deep-relocation -iso-level 3 -path-list /tmp/k3b.F25711



so the testcase 'create a data project' can *not* reproduce the issue.

-- 
You are receiving this mail because:
You are the assignee for the bug.


More information about the k3b mailing list