<div dir="ltr"><div><div>Hello Michael,<br></div>the changes will be available when there is a new release. We don't expect a 4.6.5, so you'll have to wait for a future 4.7.<br><br>This is true for any fix, distros don't usually patch packages. Instead, they wait for new releases.<br>
<br></div>Regards,<br>Alvaro<br></div><div class="gmail_extra"><br><br><div class="gmail_quote">On Wed, Nov 27, 2013 at 8:48 AM, Michael Berger <span dir="ltr"><<a href="mailto:idest@online.de" target="_blank">idest@online.de</a>></span> wrote:<br>
<blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">
<div bgcolor="#FFFFFF" text="#000000">
Hi everybody!<b><br>
<br>
</b>Some weeks ago I had reported about somewhat irritating effects
when activating the "Skip value if price is zero" option in the the
Budgeted vs. Actual Report configuration tab.<b><br>
</b>If that specific report is <b>not</b> an Investment Report (as
in my case) this option will produce senseless results if using
multi currencies and converting these to the base currency.<br>
<br>
Now, Alvaro was so kind as to remove this option in non-investment
reports.<br>
<br>
After upgrading from openSUSE 12.3 to 13.1 / 32bit I was surprised
to still see that option and producing same results as before.<br>
And that goes for KMM 4.6.3-6.1 as well as for KMM 4.6.4-2.11 which
I find in my repositories.<br>
<br>
Alvaro, as a layman I am just curious to learn how and when your
changes would become effective in openSuse?<b><br>
</b><br>
Thanks for the great on KMM and cheers!<br>
Michael<b><br>
</b>
<hr size="2" width="100%">Michael Berger, Dipl. Ing.<br>
Im Borngrund 7a<br>
D-35606 Solms<br>
<a href="mailto:idest@online.de" target="_blank">idest@online.de</a><br>
Fon: 0049 6442 706509, -10<br>
Fax: 0049 32121247536<br>
<br>
<img alt="" src="cid:part2.00090401.04000600@online.de" height="56" width="100"> <br>
<br>
</div>
</blockquote></div><br></div>