<div dir="ltr">Hi all,<div><br></div><div>Following progress of GSoC 2015 and Kipi-plugins/digiKam port to KF5, i propose the release plan below :</div><div><br></div><div>- 4.12.0 will be done in end of July, with more than 90 files close after a long bugs triage.</div><div><br></div><div>- 4.13.0 can be done on 30 August to close KDE4 release.</div><div><br></div><div>- After 30 August, we switch all codes from frameworks branches to master.</div><div><br></div><div>- 5.0.0-beta1 for KF5 can be released on 6 September, including all GSoC 2015 code ready to be review by end users.</div><div><br></div><div>- 5.0.0-beta2/3/4... from October to Christmas with one release by month if all is fine, else until code is stable (while spring 2016).</div><div><br></div><div>What do you think about ?</div><div><br></div><div>Gilles Caulier</div></div>