<table><tr><td style="">fmiroslaw added a comment.
</td><a style="text-decoration: none; padding: 4px 8px; margin: 0 8px 8px; float: right; color: #464C5C; font-weight: bold; border-radius: 3px; background-color: #F7F7F9; background-image: linear-gradient(to bottom,#fff,#f1f0f1); display: inline-block; border: 1px solid rgba(71,87,120,.2);" href="https://phabricator.kde.org/D10186" rel="noreferrer">View Revision</a></tr></table><br /><div><div><blockquote style="border-left: 3px solid #8C98B8;
color: #6B748C;
font-style: italic;
margin: 4px 0 12px 0;
padding: 8px 12px;
background-color: #F8F9FC;">
<div style="font-style: normal;
padding-bottom: 4px;">In <a href="https://phabricator.kde.org/D10186#213921" style="background-color: #e7e7e7;
border-color: #e7e7e7;
border-radius: 3px;
padding: 0 4px;
font-weight: bold;
color: black;text-decoration: none;" rel="noreferrer">D10186#213921</a>, <a href="https://phabricator.kde.org/p/lueck/" style="
border-color: #f1f7ff;
color: #19558d;
background-color: #f1f7ff;
border: 1px solid transparent;
border-radius: 3px;
font-weight: bold;
padding: 0 4px;" rel="noreferrer">@lueck</a> wrote:</div>
<div style="margin: 0;
padding: 0;
border: 0;
color: rgb(107, 116, 140);"><blockquote style="border-left: 3px solid #8C98B8;
color: #6B748C;
font-style: italic;
margin: 4px 0 12px 0;
padding: 8px 12px;
background-color: #F8F9FC;">
<div style="font-style: normal;
padding-bottom: 4px;">In <a href="https://phabricator.kde.org/D10186#213789" style="background-color: #e7e7e7;
border-color: #e7e7e7;
border-radius: 3px;
padding: 0 4px;
font-weight: bold;
color: black;text-decoration: none;" rel="noreferrer">D10186#213789</a>, <a href="https://phabricator.kde.org/p/fmiroslaw/" style="
border-color: #f1f7ff;
color: #19558d;
background-color: #f1f7ff;
border: 1px solid transparent;
border-radius: 3px;
font-weight: bold;
padding: 0 4px;" rel="noreferrer">@fmiroslaw</a> wrote:</div>
<div style="margin: 0;
padding: 0;
border: 0;
color: rgb(107, 116, 140);"><p>Yes, task2 will start with delay of 1:40 after task1 finishes.<br />
In second case, task3 will start after task2 finishes. The consecutive task is started with the given delay after the task visually above has finished.</p></div>
</blockquote>
<p>Thanks for clarifying.<br />
But what if I have the non consecutive task1 and task2 with different delays and add a consecutive task3? <br />
Does task3 start after task1 is finished or after task2 is finished or after the task with the longest delay is finished?</p></div>
</blockquote>
<p>Task3 will start after task2 finishes, assuming that task2 is the one above task3.</p></div></div><br /><div><strong>REPOSITORY</strong><div><div>R361 KTimer</div></div></div><br /><div><strong>REVISION DETAIL</strong><div><a href="https://phabricator.kde.org/D10186" rel="noreferrer">https://phabricator.kde.org/D10186</a></div></div><br /><div><strong>To: </strong>fmiroslaw, KDE Applications, kde-utils-devel<br /><strong>Cc: </strong>lueck, kde-doc-english, aacid, bcooksley, kde-utils-devel, alexeymin, genaxxx<br /></div>