<div dir="ltr"><div>Hi Gilles,</div><div><br></div><div>Firstly, I'm really excited to here that we will release beta 6.0.0 soon. So, on my branch here is the status:</div><div><br></div><div>Smugmug</div><div>- Done</div><div><br></div><div><div>Google Drive</div><div>- Done</div></div><div><br></div><div><div>Google Photo</div><div>- Export done</div><div></div><div>- Import : photos are downloaded, but not appear in digiKam view.</div></div><div><br></div><div>Facebook</div><div>- Upload photos done<br></div><div>- Problem with create albums (as I have just posted on another post in mailing list)</div><div>- App review need to be finished<br></div><div><br></div><div>Anyway, Facebook app review will take about 4 - 8 weeks and current Facebook export tool doesn't work, so I suggest that we should deactivate option for Facebook in export tool in beta 6.0.0 while I try to fix the current problem and finish app review. Besides, problem with Google Photo import is not relating to O2 and I really need feedbacks of user on GPhoto, as I migrated codes from Picasa API to GPhoto API. <br></div><div><br></div><div>My next phase will be code factorization for other web services too, so I think that maybe I should continue on devel branch in order to avoid to mess up master. What do you think about that?</div><div><br></div><div>Best</div><div><br></div><div>Thanh<br></div><div><br></div></div><div class="gmail_extra"><br><div class="gmail_quote">On Sat, Jun 16, 2018 at 2:28 PM, Gilles Caulier <span dir="ltr"><<a href="mailto:caulier.gilles@gmail.com" target="_blank">caulier.gilles@gmail.com</a>></span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div dir="ltr">Hi all,<div><br></div><div>Since the first students evaluation is passed with GSoC 2018, We can plan a first public 6.0.0-beta1 version in few days.</div><div><br></div><div>For that we need to know which branch is enough advanced to be tested in real conditions by end-users. This imply to merge back you devel branch to master. We release beta with master. If your code is enough mature, the implementation finalization can continue in master instead your devel branch until the final 6.0.0 release planed in September/October 2018.  </div><div><br></div><div>Thanh, Tarek, Yingjie, please give us a feedback about this important stage ? Thanks in advance</div><div><br></div><div>Best</div><span class="HOEnZb"><font color="#888888"><div><br></div><div>Gilles Caulier</div></font></span></div>
</blockquote></div><br><br clear="all"><br>-- <br><div class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><font size="2" face="comic sans ms, sans-serif">Mr. Thanh-Trung Dinh</font></div></div></div></div></div></div></div></div></div></div></div><div><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div><font size="2" face="comic sans ms, sans-serif">Université de Technologie de Compiègne (UTC) - France<br><font color="#000000">Tel:</font><font color="#3d85c6"> </font><font color="#000000">+33 7 53 68 20 29</font></font></div></div></div></div></div></div></div></div></div></div></div>
</div>