<!DOCTYPE html PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
<head>
  <meta content="text/html;charset=ISO-8859-15"
 http-equiv="Content-Type">
  <title></title>
</head>
<body bgcolor="#ffffff" text="#000000">
Hi Thomas,<br>
<br>
sad to hear that. According to the actual release plan<br>
<br>
<a class="moz-txt-link-freetext" href="http://www.digikam.org/drupal/about/releaseplan">http://www.digikam.org/drupal/about/releaseplan</a><br>
<br>
the final release will be<br>
<br>
2008-07-06: Final release<br>
<br>
Oliver<br>
<br>
Thomas Reitelbach schrieb:
<blockquote cite="mid:200806211528.14696.tr@erdfunkstelle.de"
 type="cite">
  <pre wrap="">On Samstag, 21. Juni 2008, Oliver Dörr wrote:
  </pre>
  <blockquote type="cite">
    <pre wrap="">So why, where is no check in message from Thomas? He has send it to me
via mail (I believe using CCMAIL).

The proof-reading checking is missing and I've read it a few week ago
with my own eyes...

I hope that Thomas could clarify it. He had done the proof-reading and
checked it in. My local copy of the SVN that i checked out before my
holidays had also the proof-reading inside. After doing an svn up it was
gone and the reported bug was back.

To be honest, I did not know what happened. All I know is that the bug
was fixed a few weeks ago and that I could not even see the fix check-in
from Thomas in svnlog.
    </pre>
  </blockquote>
  <pre wrap=""><!---->
That's because all my work and svn commits took place 
in /branches/stable/l10n, but the script takes the i18n release-files 
from /trunk/l10n-kde3/.

Obviously I was working on the wrong branch :( 
I'll have to merge my proof-read translations from stable into 
trunk/l10n-kde3. This will be a huge load of handwork. How much time do I 
have until the final tarballs are packed? It'd be really a pitty if all proof 
reading would be lost for this release :(

Cheers
Thomas

PS: Please CC me, I'm not on the list.
  </pre>
</blockquote>
</body>
</html>