<br><br><div><span class="gmail_quote">2007/12/30, Oliver Dörr <<a href="mailto:oliver@doerr-privat.de">oliver@doerr-privat.de</a>>:</span><blockquote class="gmail_quote" style="border-left: 1px solid rgb(204, 204, 204); margin: 0pt 0pt 0pt 0.8ex; padding-left: 1ex;">



  
  

<div bgcolor="#ffffff" text="#000000">
Hi Gilles,<br>
<br>
from my perspective as translator i don't like that betweeen digikam
0.9.5 final release (2008-07-06) and digikam 0.10.0 final release
(2008-06-29) is only one week. I would prefer two weeks between those
days. From my experiences we will have a few string changes during the
string freeze and with two weeks between the releases i have enough
time to concentrate on 0.10.0 and have two weeks for translating and
proof-reading  0.9.5</div></blockquote><div><br>I have delayed 0.10.0 final to middle of July. Fine for you ?<br><br>Gilles</div></div><br>