<html><body style="word-wrap: break-word; -webkit-nbsp-mode: space; -webkit-line-break: after-white-space; "><div><div>On Aug 17, 2009, at 4:48 PM, Lydia Pintscher wrote:</div><br class="Apple-interchange-newline"><blockquote type="cite"><div>On Mon, Aug 17, 2009 at 22:42, Leo Franchi&lt;<a href="mailto:lfranchi@kde.org">lfranchi@kde.org</a>&gt; wrote:<br><blockquote type="cite">Hi dudes and dudettes,<br></blockquote><blockquote type="cite"><br></blockquote><blockquote type="cite">The end of SoC is upon us. The time for 2.2 has come!<br></blockquote><blockquote type="cite"><br></blockquote><blockquote type="cite">This means, primarily, that we need to freeze. Given the mad bug-<br></blockquote><blockquote type="cite">triaging that Myriam has been doing, it should be easier than ever to<br></blockquote><blockquote type="cite">zero in on our bugs and resolve as many as we can for 2.2 final.<br></blockquote><blockquote type="cite"><br></blockquote><blockquote type="cite">Do people have any things they want to get in before we hard freeze? I<br></blockquote><blockquote type="cite">propose the following:<br></blockquote><blockquote type="cite"><br></blockquote><blockquote type="cite">August 28th (fri): String freeze, soft feature freeze, tag/release 2.2<br></blockquote><blockquote type="cite">Beta 1<br></blockquote><blockquote type="cite">Sept. 11th (fri): Hard feature freeze, 2.2 Beta 2<br></blockquote><blockquote type="cite">Sept. 25th (fri): Release 2.2 final<br></blockquote><blockquote type="cite"><br></blockquote><blockquote type="cite">I'm unsure if 4 weeks is too little time---I would say to try this<br></blockquote><blockquote type="cite">schedule, and if we have to, release a beta3 instead of final, and<br></blockquote><blockquote type="cite">push back final to Oct. 9th or so.<br></blockquote><blockquote type="cite"><br></blockquote><blockquote type="cite">thoughts?<br></blockquote><blockquote type="cite">leo<br></blockquote><br>Looks good to me besides one thing: I will be at FrOSCon this weekend<br>very likely. This means packing and university stuff on Friday. Given<br>that the release script has not been tested with git before I see a<br>lot of problems on my way. So I'd rather move that to late Monday or<br>even Tuesday.<br><font class="Apple-style-span" color="#000000"><font class="Apple-style-span" color="#144FAE"><br></font></font></div></blockquote><br></div><div>Works for me. I just picked friday as I needed an arbitrary date to set things. We can move all the dates up 4 days.</div><div><br></div><div>leo</div></body></html>